A ten-position PHR-10 branches to a five-position PHR-5 and two individually ferruled leads. Both JST PH housings have a 2.0 mm pitch.
This JST PH breakout harness brings three connection points into one 520 mm assembly: a PHR-10 common end, a PHR-5 board branch and two ferruled leads. During service, the board branch can be unplugged while the red and black leads stay in their terminals.
A board change should not mean undoing the wiring at the terminal block. This 520 mm JST PH wire harness lets the five-position PHR-5 branch unplug as one piece while the red and black ferruled leads stay connected. Both branches run back to a single ten-position PHR-10 housing.
| Connection | What to match on your equipment |
|---|---|
| PHR-10 common end | The matching ten-position PH board header and its cavity numbering. |
| PHR-5 branch | The five-position PH board header and the space needed to pull the housing free. |
| Ferruled pair | Two receiving terminals sized for the ferrules. Identify each circuit on the wire list. |
Both JST PH housings have a 2.0 mm pitch. Your wire list identifies which cavities are populated and where each wire goes. For a board with a VH header and only two leads to terminate, compare the JST VHR-4N two-wire pigtail with ferrules. It uses a different mating header and has no second board branch.
A cable can reach the far wall of a cabinet and still fall short at the board. Mark the point where the wiring splits, the path to the PHR-5 and the path to the two terminals. The 520 mm dimension describes the listed cable; it does not give either branch reach on its own.
Goochain can turn your sketch into a branch drawing, check the connector references and prepare a sample with the specified ferrules and branch lengths. The same drawing gives purchasing one harness to reorder instead of two individually prepared branches. Send the cavity map, measurement endpoints and order quantity. Our custom cable assembly RFQ guide shows which drawings and electrical details are useful before quoting.
Keep required fields minimal. Attach drawings/photos for accurate quoting.
Tip: A simple installation photo often saves 2–3 rounds of questions.
Quotation 1–2 days; development 15–20 days; mass production 20–25 days (project dependent).
Yes. Reference sample + requirements helps confirm drawings and test plan.
Depends on materials and complexity. We support prototypes and scalable mass production.