A 5-position, 1.25 mm pitch PicoBlade receptacle connects to a black 2 × 5 housing through a 350 mm wire harness.
The white connector on this assembly is a Molex 51021-0500: five positions in one row at 1.25 mm pitch. The black connector presents two rows of five. Goochain can build the harness to the occupied cavities and wire map on your drawing, so each module keeps its existing mating connector.
Two boards can have the right electrical connections laid out in different housings. Goochain builds this 350 mm Molex PicoBlade cable assembly to link a five-position, single-row interface to a black ten-position dual-row interface. It lets an OEM retain both board headers and define the connection between them in the wire map.
Molex 51021-0500, also written 0510210500, is the white PicoBlade receptacle housing. On this wire-to-board connection, the five positions are spaced 1.25 mm apart. If your drawing instead calls for a five-position SH housing at 1.0 mm pitch, see the JST SHR-05V-S-B cable assembly. The two families use different mating interfaces.
The black connector has two rows of five available positions. A photo shows the layout; the wire map tells you which positions connect to the white housing. Label each drawing as a mating-face or wire-entry view and mark pin 1 or a keyed corner before comparing the two ends.
For a matching sample, send the black mating connector or its full reference, the destination for each populated white cavity and the points used to measure 350 mm. Goochain can lay out the two views, prepare a sample and use the approved drawing to check the cavity locations on subsequent builds.
Trial-fit the sample with both modules installed. The housings need room to seat, and the wire exits need clearance when the enclosure closes. Our factory inspection process shows how Goochain follows a build from incoming components through final inspection.
Keep required fields minimal. Attach drawings/photos for accurate quoting.
Tip: A simple installation photo often saves 2–3 rounds of questions.
Quotation 1–2 days; development 15–20 days; mass production 20–25 days (project dependent).
Yes. Reference sample + requirements helps confirm drawings and test plan.
Depends on materials and complexity. We support prototypes and scalable mass production.