China HRS-18PM to SH 1.0 Crimp Terminal Breakout Harness, 1 m manufacturer
HRS-18PM to SH 1.0 Crimp Terminal Breakout Harness, 1 m
HRS-18PM to SH 1.0 Crimp Terminal Breakout Harness, 1 m
HRS-18PM to SH 1.0 Crimp Terminal Breakout Harness, 1 m
HRS-18PM to SH 1.0 Crimp Terminal Breakout Harness, 1 m
HRS-18PM to SH 1.0 Crimp Terminal Breakout Harness, 1 m

Overview

Staged Assembly of Instrument and Equipment Looms

  • Use the breakout where individual leads must pass along different routes before entering a final housing. The operator can follow the numbered wire list while the equipment-side plug remains a finished unit.

Lead Numbers, Contact Selection and Housing Insertion

  • Goochain can align the wire markers with your cavity schedule, set individual free lengths and quote a housed or unhoused terminal end. Confirm the jacket color independently of the black connector body.
Send the Wire List for a Numbered Breakout Sample: Provide the mating plug reference, SH contact drawing, wire number-to-cavity list, required jacket color and quantity. Mark which insertion steps your production team wants to perform in-house.

Typical Specs

  • Connector reference | HRS-18PM; black connector body
  • Breakout termination | Individual SH 1.0 crimp contacts, supplied without a common housing
  • Lead identification | Multicolor breakout with numbered wire markers
  • Cable length | 1,000 mm (1 m)

Have the crimping done before the harness reaches your bench, but keep control of when the contacts go into their housing. This 1 m HRS-18PM breakout has a finished black plug at one end and individual SH 1.0 crimp contacts on numbered, color-coded leads at the other.

Route first, insert the contacts last

An assembler can pass individual leads through an opening or around a bracket before inserting them into the specified cavities. The metal contacts are already fitted, so that work can be done without a crimping tool at the final assembly station. For equipment that needs a fitted SH housing on delivery, see the four-position SH housing on our USB-C terminal cable.

Make the label on the wire match the line on the work order

A wire number stays useful even when two insulation colors look alike. Give Goochain the numbering scheme your operators already use. We can match each marker to its HRS contact, free lead length and destination cavity, then supply a labeled prototype for the people who will actually install it.

For repeat orders, the approved wire list gives our assembly team and your receiving team the same reference. Goochain’s factory quality documentation includes its ISO 13485 quality system certificate and examples of traceability labels and inspection records. If your incoming inspection requires a particular marking or record, it can be agreed when the sample is ordered.

Request a Quote

Keep required fields minimal. Attach drawings/photos for accurate quoting.

RFQ checklist

  • Device model / system name
  • Connector type + pinout
  • Power/data spec (PD? data?)
  • Target annual quantity
  • Drawings / photos

Tip: A simple installation photo often saves 2–3 rounds of questions.

Web form

(optional but recommended)
captcha
Email Instead

FAQ

Lead time?

Quotation 1–2 days; development 15–20 days; mass production 20–25 days (project dependent).

Can you build from a sample?

Yes. Reference sample + requirements helps confirm drawings and test plan.

MOQ?

Depends on materials and complexity. We support prototypes and scalable mass production.